References
Installation of the waste heat recovery unit
Bobcat Doosan (Dobříš)
We obtain waste heat from the burner chimneys of the powder coating line’s baking oven and use the obtained heat to heat the chemical pretreatment tanks.

6 pieces of recovery heat units

power obtained 120kW

control panel
Carrier (Mýto u Rokycan)
We obtain waste heat from the operational exhaust of the baking and drying oven of the powder coating line and use the obtained heat to heat the chemical pretreatment tanks.
Two recovery heat units installed.
Tritón Pardubice, spol. s r. o. (Pardubice)
We obtain waste heat from the operational exhaust of the powder coating line’s baking oven and use the obtained heat to heat the chemical pretreatment tanks.
PULCO a.s. (Brno)
Odpadní teplo získáváme z provozních odtahů vypalovací pece práškové lakovací linky a získané teplo využíváme na ohřev van chemické předúpravy.
TREVOS, a. s. (Turnov)
We obtain waste heat from the operational exhaust of the powder coating line’s baking oven and use the obtained heat to heat the chemical pretreatment tanks.
Measurement and analysis of energy potential

Araprim s.r.o.

SW-Motech s.r.o.

Tritón Pardubice, spol. s r. o.

PULCO a.s.

KARSIT HOLDING s.r.o.

Aluminium Group a.s.

Hobra-Školník s.r.o.

Electropoli Group

Vertiv Czech Republic s.r.o

MRB SAZOVICE, SPOL. S R. O.

SEMET s.r.o.

TREVOS, a. s.

ITAB Shop Concept CZ, a.s.
(Boskovice)

Beghelli-Elplast, a. s.
(Brno)

KYB Manufacturing Czech s.r.o.
(Pardubice)

AB KOMPONENTY s.r.o.
(Brno)

ZLKL, s. r. o.
(Loštice)

Alliance Laundry
(Příbor)

SUCHÁNEK & WALRAVEN, s.r.o.
(Horka u Staré Paky)

SERVIS CLIMAX a.s.
(Vsetín)

Alcadrain s.r.o.
(Břeclavi)

Ecos s.r.o.
(Vysoké Mýto)

Gondella CZ s.r.o.
(Říkov)

Iveco Czech Republic, a. s.
(Vysoké Mýto)

PZP KOMPLET a.s.
(Dobruška)

FRITZMEIER S.R.O.
(Vyškov)

LETOVICKÉ STROJÍRNY, s.r.o.
(Letovice)

Carrier refrigeration operation Czech republic s.r.o.
(Mýto u Rokycan)

Lindab s.r.o.
(Praha)





































